Carpet Installation Labor Proposal
|
| Kenneth J. Frango 10036 N. 57th Drive Glendale, Arizona 85302-1327 ph 623-915-1760 fax 623-915-0158 www.floormagic.biz AZ ROC license 108590 Res, 210265 Com |
|
|
|||||
| Price for this carpet installation project including travel, lodging and
night-time premium is $5.19 per square foot. |
| ITEM | DESCRIPTION | QTY | RATE | AMOUNT |
|---|---|---|---|---|
| Carpet Installation |
Install tufted carpet provided by AFR directly glued to the concrete
subfloor in the Nine West Outlet store #2707 located at Prime Outlets, 6645
S. Highway #179, Suite C-3 Sedona, AZ 86351 Store Manager- ? Material Required 12' X 198' 264.0 sq. yds. Cut sizes- (4) 12' X 37', (1) 12' X 50' |
2220.0 sq. ft. | 0.55 | $1221.00 |
| Carpet Removal | Remove glued down carpet | 2220.0 sq. ft. | 0.40 | $888.00 |
| Adhesive removal | Remove old adhesive contamination from the concrete sub-floor. | 2220.0 sq. ft. | 0.40 | $888.00 |
| Floor preparation | Patch control joints, repair failing or missing patching compound. | 4.0 hours | 75.00 | $300.00 |
| Pattern Matching | Align pattern and seal at seam- adjust bow, skew and elongation of material that falls inside manufacturer's tolerances. | 2220.0 sq. ft. | 0.40 | $888.00 |
| Delivery | Pick up and deliver floor covering and accessories to the job site from a Phoenix metro warehouse. | 2376.0 sq. ft. | 0.15 | $356.40 |
| Haul away | Haul away and dispose of old floor covering and job waste in a safe and accepted manner. | 2220.0 sq. ft. | 0.20 | $444.00 |
| Cove base | Supply and install 4" black vinyl cove base and adhesive to replace existing cove base. | 200.0 linear ft. | 2.50 | $500.00 |
| Receiving |
AFR to ship freight prepaid will call s/m Ken Frango to - c/o Mastercraft 3440 W. Lewis Suite C Phoenix, AZ 85009 |
2376.0 sq. ft. | .20 | $475.20 |
| Furniture R&R | Furniture removal and replacement. Move and replace the following- (28) Wheeled Racks (10) Benches, (4) Tables, disassemble & reassemble (29) Stationary racks, (1) Mirror. Merchandise to be removed from floor and shelving by others in area to be re-carpeted. | 150.0 hands | 5.00 | $750.00 |
| Carpet Adhesive | Supply premium carpet adhesive | 28.0 gallons | 13.00 | $364.00 |
| Obstruction | Cut flooring around obstructions (cash wrap) | 36.0 lin. ft. | 6.00 | $216.00 |
| Transitions | Supply & install Vinyl transitions at 4 doorways. | 12 lin. ft. | 5.00 | $60.00 |
| Travel charges | Round trip transportation via truck. | 200 miles | $1.00 | $200.00 |
| Lodging & Meals | One two man crew for five days. | 5 days | $250 | $1250.00 |
| Overtime | After business hours, overtime installation. 50% of quoted labor. | 5431.00 | 50% | $2715.50 |
| Terms- payable to Kenneth J. Frango due no later than thirty days from completion of project. Liability Insurance page | |
| Total | $11,516.10 |
Kenneth J. Frango -
www.floormagic.biz --
www.FloorMaven.com | ||||||||||||||||||||